A test case study

Something about the test case study

Total Savings

€30,303

Payback Period

1.6 years

Assumptions

Savings based on operational costs supplied at time of installation

Lorum ipsum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Mauris nunc dui, scelerisque in mauris sed, iaculis sollicitudin lacus. Suspendisse at nibh diam. Mauris vitae consectetur leo. Donec vehicula purus blandit odio volutpat tincidunt. Sed sagittis vitae leo quis rutrum. Nunc eget mauris augue. Vivamus blandit luctus libero, at pellentesque justo volutpat non. Mauris venenatis ut eros eu pharetra. Maecenas facilisis leo ut laoreet sagittis.

Speak to one of our friendly team

 

Telephone: (01736) 447307

Email: [email protected]

Address: Unit 5G, Long Rock Industrial Estate, Penzance, Cornwall TR20 8HX.

Here's what our customers say:

'Joss and his team were pulled late into our project because it had confounded others, so his timeline was horrifyingly short. NSN performed a fresh assessment, quickly offered options, quotes, and a timeline, and had their team on the project within a week. Joss kept us informed and was unflaggingly generous of his time and expertise.'
Electrical Installation Testimonial
Chip Montrose

We work with trusted brands

Plant One Cornwall Logo

Sign up to our newsletter

Stay up to date with the latest news and services by joining our mailing list.